top of page


$25K Bathroom Remodel in San Jose, California: Cost, Timeline, Process, and What Homeowners Should Expect
This San Jose project consists of two related bathroom improvement scopes. The primary scope is a full guest bathroom remodel estimated at approximately $20,375. The secondary scope includes partial wall removal and related improvements in an upstairs bathroom, estimated at approximately $4,250.
The guest bathroom remodel begins with the removal of the existing shower door, tub, shower tile, vanity, toilet, light bar, mirror, medicine cabinet, and carpeted flooring. The new
Antolin Corona
Jul 3010 min read


$19K Bathroom Remodel in Pleasanton, California: Cost, Timeline, Process, and What Homeowners Should Expect
This project focuses on bathroom upgrades across the home, including improvements to flooring, fixtures, lighting, and shower systems.
The hallway bathroom scope includes existing toilet removal, flooring and baseboard removal, tile installation, baseboard installation and painting, new toilet installation, and garbage hauling. The hallway vanity area includes existing countertop and sink removal, countertop fabrication and installation, two sink installations, two faucet in
Antolin Corona
Jul 297 min read


$24K Garage Remodel in Los Gatos, California: Cost, Timeline, Process, and What Homeowners Should Expect
This project involved a garage remodel in Los Gatos with a focus on creating a cleaner, more finished, and more usable garage interior. Rather than converting the garage into an ADU or full living space, the scope centered on improving the garage envelope, finishes, lighting, storage separation, and floor surface.
The work started with demolition of existing cabinets and wood ceiling materials. From there, the project included ceiling joist installation, wall and ceiling ins
Antolin Corona
Jun 309 min read


$22K Bathroom Remodel in San Jose, California: Cost, Timeline, Process, and What Homeowners Should Expect
This project involved a full bathroom remodel in San Jose with a strong focus on creating a cleaner, more functional, and easier-to-use bathroom layout.
The scope included demolition of the existing shower door, shower wall tiles, floor tiles, tub, vanity, toilet, vanity light bar, heat fan, and fixtures. After demolition, the work continued with water valve replacements, closet shelf replacement, exhaust fan replacement, recessed lighting installation, drain relocation, lin
Antolin Corona
Jun 249 min read
bottom of page
.webp)